COMMERCIAL & CIVIL PROJECTS / GREEN-FIELD CONSTRUCTION
Elite Residential Complex with Two Floor Underground Parking
Elite Residential Housing Complex with underground parking
Elite Housing Complex
Arbitration Courthouse
Educational Centre of Ioffe Physical Institute, Russian Academy of Sciences
Exhibition Complex Lenexpo, pavilion No.4
Elite Residential Complex with Two Floor Underground Parking
Client OOO Logic Realty
Location Moscow
Brief description of works Turn-key construction of an elite housing complex of 12500 m2 gross area with two level underground car parking at Kakovinsky Pereulok. The first and second floor levels of the building are office premises where as at the top floors duplex flats are located
Construction period 12 months, current contract of 2000-2001
Elite Residential Housing Complex with underground parking
Client OOO NK Kompev-Oil
Location Moscow
Brief description of works 8-storeyed, 16000 sqm elite housing complex construction at Skolkovskoe shosse, 1 km out of the Moscow Ring Road (MKAD), on the territory of the Development Fund of International University.
Construction period 12 months, current contract of 2000-2001
Elite Housing Complex
Client ÇAO ÌÄÑ
Location Ostojenka, Moscow
Brief description of works Turn-key construction of an office-housing complex with gross construction area of 11,500 m2 at downtown Moscow. Seventeen Cottages oriented as blocks surrounding an interior yard, underground parking and office spaces at the first floor level. Each block of five floor cottages are supplied with their own winter gardens, individual lifts and terraces. Facades shall be finished with natural granite, exposed brick, artificial stone and mineral plaster. All engineering systems including ventilation, air conditioning, heating, security/access control systems etc.
Construction period 15 months, current contract of 2000-2001
Arbitration Courthouse
Client YANAO Investment Construction Corp.
Location Yamal Nenets Autonomous District in Salekhard, 6, Ul. Tchubynina
Brief description of works Total design and build turnkey project for a monolithic R/C 1500 sqm 3-storey courthouse of original architecture with a lock-up.; 4 courtrooms, canteen sitting 30 people. Exterior warm walls (aerated concrete, sealant and masonry) with further fine plastering and painting are to be erected. Construction is carried out in Polar climatic permafrost zone
Construction period 12 months, current contract of 2000
Educational Centre of Ioffe Physical Institute, Russian Academy of Sciences
Client PhTI named after Ioffe
Location 8a Khlopina Str., St-Petersburg
Brief description of works Turnkey construction project for a 15,500sqm multipurpose building: multi-span steelwork in-situ R/C structure with exterior effective brick winterproof walls; installation of utilities, site hardscaping and landscaping. The campus complete with all mod cons: school, dormitory, athletic facilities, roofed tennis court, swimming pool, a 400-seat conference hall and transformer's. Installation of underfloor heating system, 2000 sqm stained glass. Civil and erection works were finished in 7 months.
Construction period 13 months, 1996-1999
Exhibition Complex Lenexpo, pavilion No.4
Client VAO LENEXPO
Location St-Petersburg
Brief description of works Subcontract on finishing, including facade works (gross area 9,800 sqm)
Construction period 3,5 months, 1995