INDUSTRIAL PROJECTS / PRODUCTION FACILITIES
Klin Brewery
Chocolate Factory
Sibirskaya Korona Brewery Warehouse
Baltika Brewery Yeast Department
FORD assembly factory
Modernization of DONPIVO manufacture for BALTIKA-DON Brewery
Renovation and modernization of brewing manufacture TULSKOYE PIVO
Baltika Brewery Warehouse
Baltika Brewery Keg Department
Baltika Brewery Brewing Department
Baltika Brewery Checkpoint for Heavy Trucks
Baltika Brewery Bottling Department
Baltika Brewery Transportation Facility
Klin Brewery
Client Sun Interbrew
Location Klin, Moscow Region
Brief description of works Design and build, green field brewery construction near the existing Klinskoe Brewery for Sun Interbrew. The detailed design, supply and execution of the foundations for all process plant, buildings and pipe bridges, necessary heating, ventilation and small power distribution for the buildings, the brewery buildings concrete hopper for malt unloading, internal floor and wall finishes, the sinking of new boreholes (assumed 4 in number) and provision of borehole pumps for the provision of raw water, reservoir and effluent pit, lighting for both process, service and office areas, process water, H&V and all power installations
Construction period 12 months, 2000-2001
Chocolate Factory
Client Stollwerck
Location Pokrov, Vladimir Region
Brief description of works Design and build chocolate factory extension project with 14,000 m2 building area. Upon completion of construction the current annual production capacity of 36,000 tons shall be increased by 56,000 tons. Within the framework of this project raw material production, chocolate production, chocolate packing and ready product storage sections, loading dock, railway ramp, a total length of 300 m access road and 2500 sqm of parking area for heavy trucks shall be built including mechanical and electrical works.
Construction period 8 months current project of 2000-2001
Sibirskaya Korona Brewery Warehouse
Client ZAO Rosar
Location Omsk
Brief description of works Design and built green field construction of 2,200 sqm warehouse for final product storage with special industrial floors, loading dock, railway ramp, including all engineering works.
Construction period 8 months 2000
Baltika Brewery Yeast Department
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Complete design, and construction of 1000 sqm., 20 m high steel and reinforced concrete structure of Yeast Department with sandwich panel siding and installation of 36 cylindrical yeast tanks.
Construction period 6 months, current project of 2000
FORD assembly factory
Client GABEG Anlagenbau-Engineering GmbH
Location Vsevolozhsk, Leningrad Region
Brief description of works Reconstruction of the Russky Diesel plant. The total project area is 35,568 m2. As a requirement of the client the project was divided into several tender packages. By today Renaissance Creation has already awarded 6 of these packages including the whole ventilation systems of the factory, construction of the Management Building with all finishing works, ventilation, plumbing systems, treatmant plant construction, at Paint Shop seven ground ventilation ducts (L=50 lm)
Construction period Current project of 1999-2000
Modernization of DONPIVO manufacture for BALTIKA-DON Brewery
Client BALTIKA Brewing Corporation
Location Rostov-na-Donu
Brief description of works Modernization of BALTIKA-DON brewery in Rostov-na-Donu with a construction area of 21,760 sqm. Design, build and renovation project for a bottling plant and ready product- container storage. Expansion of warehousing: construction of a new warehouse for ready products, gross area 10,000sqm. Reconstruction of the bottling plant, total area 5,000 sqm. Rehabilitation of storage area for final products and containers, bottling plant, railway ramp, loading deck, production premises, site infrastructure. Modern industrial flooring systems in the existing warehouse, providing greater resistance, improving, repairing and protecting monolithic floors.
Construction period 6 months, 1999-2000
Renovation and modernization of brewing manufacture TULSKOYE PIVO
Client BALTIKA Brewing Company
Location Tula
Brief description of works Design, build and renovation project for the main production facility, bottling plant with final product- container warehousing of BALTIKA Brewing Co. division in Tula TULSKOYE PIVO brewery. Construction of a 780sqm fermentation plant. Construction of a 216 sqm fast-working yeast division. Refurbishment of an 10,000 sqm finished product- container storage for the bottling plant. Advanced industrial flooring at the production areas.
Construction period Current project of 1999-2000
Baltika Brewery Warehouse
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Design/build project of 30,000 sqm end product warehouse, including: 14,500sqm steel structured warehouse equipped with lighting, heating, ventilation, fire alarm systems, 22 loading docks, advanced floor system with a maximum wear resistance, management building of 2,600sqm with external siding of sandwich panels a 800sqm check-pass point for heavy trucks, steel structure with 3 passages fitted with the automatic lift hinged gates, closed conveyor gallery for conveying the end product from bottling department to the warehouse (77m long), a 200sqm in-situ R/C gas vessel storage, a 1300 sqm railroad ramp, a 9,000sqm open delivery and parking lot for freight trucks and fillers, max wear resistance surface coating.
Construction period 10 months, 1998-99
Baltika Brewery Keg Department
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Design aspects and reconstruction of a 1500 sqm present block
Construction period 3 months, 1998-99
Baltika Brewery Brewing Department
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Design and build contract of a 16m high, 900 sqm large brewing unit: of composite steel structure enveloped with prefabricated panels; installation of special process equipment and sewage system
Construction period 9 months, 1998
Baltika Brewery Checkpoint for Heavy Trucks
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Design and construction of 900 sqm R/C and steel structured check-and-pass unit for heavy trucks and site modernization, 16m high, 900 sqm large brewing unit: of composite steel structure enveloped with prefabricated panels; installation of special process equipment and sewage system, a 10,000 sqm bottling department; special floor system with epoxy surface proof against chemicals, reconstruction works of an existing 1500 sqm block to be used as Keg Department
Construction period 3,5 months, 1998
Baltika Brewery Bottling Department
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Design aspects and reconstruction project for a 10,000 sqm bottling department; special floor system with epoxy surfacing proof against chemicals and process sewage system.
Construction period 3 months, 1998
Baltika Brewery Transportation Facility
Client Baltika Brewery Corporation
Location St-Petersburg
Brief description of works Design and build contract of 3500 sqm industrial facilities; 25000 sqm open parking lot for the truck fleet; service and overhaul premises, car wash, waste water treatment, utilities; monolithic R/C and steel works, precast panel siding
Construction period 5 months, 1997